The Crew Contract

Lineholder minimum days off, United pilots

United Pilot Agreement 2023Effective Last checked Clear

Short answer

At least 12 days off in a full bid period. When your line is built in the monthly bid, you also get a day off at base in every seven days unless you opt out.

What the contract says

“When a Lineholder is available for a full Bid Period, his schedule shall contain a minimum of twelve (12) days off.”

Section 5-E-4-a · opens the contract at this clause

“After Monthly Schedule Preferencing, if no Pilots are on Involuntary Furlough, a Lineholder may reduce his minimum number of days off provided in Section 5-E-4-a or 5-E-4-b, as applicable, by up to two (2).”

Section 5-E-4-d · opens the contract at this clause

What if I’m not available all month?

Vacation or other absences in the bid reduce the minimum on a prorated table in the contract. § 5-E-4-b

Can I give up days off?

After the monthly bid, and only while no pilot is on involuntary furlough, you can reduce your minimum days off by up to two. § 5-E-4-d

Can I opt out of the one-in-seven rule?

Yes. The one day off at base in each seven-day period applies between trips, reserve and short training, and a lineholder may opt out of it. § 5-E-4-c

Training has its own rule, which applies notwithstanding that one: a pilot scheduled for training of less than five days gets at least one day off in each seven days. If the seven days mix line flying and training, you may work up to seven days in a row of that combined duty, as long as the seventh day is not a one-day trip or a one-day training assignment. § 9-F-11

This page explains contract language; it is not legal advice. If your situation is not covered, ask your union representative.