The Crew Contract

Long call reserve notice for United pilots

United Pilot Agreement 2023Effective Last checked Clear

Short answer

18 hours before report (16 before a short call). 14 for assignments made 1200–1359, but not on your last day off before reserve; 12 on a VEC line.

What the contract says

“a Long Call Reserve must be assigned the Trip with a minimum of eighteen (18) hours notice prior to report time or a minimum of sixteen (16) hours notice prior to the start of a Short Call period”

Section 20-K-5-a · opens the contract at this clause

“when an assignment is made in the window between 1200 and 1359 window (as prescribed in Section 20-I-6-c) the notice period shall be fourteen (14) hours”

Section 20-K-5-a-(1) · opens the contract at this clause

“all Reserves other than those Pilots on VEC or VSC Reserve shall require 18 hours notice (or 16 hours to the start of a Short Call period) on the last day off prior to Reserve”

Section 20-K-7-c · opens the contract at this clause

Where does the 18 hours count from?

From the time the trip is assigned to you, measured to the trip’s report time (or to the start of the short call). § 20-K-5-a If you are in post-trip rest, the notice counts from the end of that rest. You can choose to accept an assignment during the rest; then the notice counts from the moment you accept. § 20-Q-10-e

What changes in the 1200–1359 window?

An assignment made in the window between 1200 and 1359 (the contract points to 20-I-6-c for it) needs only 14 hours’ notice before report time or the start of a short call. § 20-K-5-a-(1)

What about my last day off before reserve?

On the last day off before your reserve days, every reserve except VEC and VSC reserves needs the full 18 hours (or 16 before a short call), whatever time the assignment is made. The contract’s example: at 1700 on your last day off you can be assigned a trip reporting no earlier than 1100. § 20-K-7-c

Is it different on a VEC line?

Yes. A Voluntary Early Check reserve on long call can be assigned with 12 hours’ notice, or 14 hours if the assignment is made on the last day off. § 20-K-5-a-(2)

Can I accept less notice?

Yes. The contract lets a pilot waive these notice provisions, so you can agree to a shorter call-out. § 20-K-5-a-(3)

This page explains contract language; it is not legal advice. If your situation is not covered, ask your union representative.